Projects

Naramata Bench Shoreline Restoration

Extreme lake Extreme lake flood levels during spring 2017 resulted in erosion of over-steep slopes fronting a redevelopment of a residence in North Naramata. Impacts to the riparian area were mitigated by removing fill to a stable grade and adding logs to create terraces. The terraces were also stabilized with rocks and grass seed. Native shrubs and trees will be installed during spring 2019.

Read More
Naramata Bench Shoreline Restoration

Fascieux Creek Restoration at K.L. O. Middle School

Arsenault phased the project so that available funds could initiate Phase 1 immediately, before funding lapsed. The first phase involved day-lighting 90 m of underground stream with permitting documents including a stream crossing design, environmental management plan, and Water Act application. Plans were put in place for fish and turtle salvage.

Read More
Fascieux Creek Restoration at K.L. O. Middle School

Cottonwood Cove RV Resort

The project included an assessment of impacts to fish habitat from existing infrastructure (docks, buoys, boat launch, flooding, fish stranding) and effects of improvements (riparian protection areas established, bio-engineering, flood mitigation, dryland boat storage, boat launch upgrades, strata marina, etc.).

Read More
Cottonwood Cove RV Resort

What We Do